
APC NetShelter Rack PDU Advanced, Metered, 3Phase, 11kW 400V 16A or 11.5kW 415V 20A, 42 Outlets, IEC309
Part number UPA-APDU10250ME
Includes GST · $200.72 GST
Backorder — ask for ETAShips from an interstate branch — $35, 1–3 business days. Express is not available on this item right now because the stock is not in a local warehouse.
Need it installed? Ask for a supply-and-install quote — usually cheaper than sourcing an installer separately.
Description
APC NetShelter Rack PDU Advanced, Metered, 3Phase, 11kW 400V 16A or 11.5kW 415V 20A, 42 Outlets, IEC309APC NetShelter Rack PDU Advanced provide reliable power distribution to IT Equipment within server and/or networking racks. PDU level power metering via remote access and local display for power visibility and notification of potential overload. 4-in-1 combination outlets which can be used as either C13, C19, C15, or C21 outlets provide unparreled deployment flexibility. Maximum outlet density with 42 outlets in a 2.2' wide form factor. Outlets on the PDUs are color coded and/or labeled by breaker and input phase on 3 phase models to simplify deployment. Provides an alternating phase design whereby each of the 3 phases are organized into small outlet groups which alternate from top to bottom of the PDU to facilitate better power cord management and promote better load balancing. Power Sharing allows PDUs cascaded together via 2 ethernet ports enable an Network Management Card to continue functioning in the event of an AC power loss.
Colour Black
Product or component type PDU
PDU type Metered
Cord length 1.8 m
Input Voltage 415 V 3 phases, 400 V 3 phases
Product certifications- UKCA, TAA compliance
Standards- UL 62368-1, CSA C22.2 No 62368-1, FCC part 15 Subpart B, CE, EN 62368-1
IP degree of protection IP44
Ambient air temperature for operation -5…60 °C
Relative humidity 5…95 %
Operating altitude 0...10000 ft
Ambient air temperature for storage -25…65 °C
Storage Relative Humidity 5…95 %
Storage altitude 0.0000000000…15240.0000000000 m
- Australia-wide deliveryMelbourne metro typically 1–3 business days.
- Full manufacturer warrantyWe administer claims for you.
- Installed by the people who sell itAsk for a combined supply-and-install price.
More like this
Others in Data Racks & Accessories
Astrotek M6 Cage Nuts & Screws (Pack of 10) Silver Color Oxide Finish Phillips Drive Length Fully Threaded
Aten 15A/10A 8-Outlet 1U Metered & Switched eco PDU, emote power outlet control (On, Off, Power Cycle) by individual outlets, Green Package
LDR 10-Port 10A Power Distribution Unit AU Approved - 10x 3-Pin AU/NZ Outlets/Slots - 1U Vertical Mount
Want this installed properly?
We install this equipment on Melbourne sites every week. Ask for a supply-and-install quote and you get one supplier, one warranty conversation and a system commissioned by the people who sold it to you.
Get in touch
Ask about APC NetShelter Rack PDU Advanced, Metered, 3Phase, 11kW 400V 16A or 11.5kW 415V 20A, 42 Outlets, IEC309
Quantities, lead time, compatibility or a supply-and-install price on the UPA-APDU10250ME — send it through and we will come back the same business day.
- Trade-informed pricingDistributor cost plus a transparent margin, not a retail markup.
- Anything in the rangeThe catalogue online is a fraction of what we can order — ask for a part number.
- Supply and installWant it fitted? Ask for a combined quote; the labour is usually where the saving is.
- Australia-wide deliveryMelbourne metro 1–3 business days, with express where the stock is local.