Skip to main content
Google reviews
Nootz Security Services logo
APC NetShelter Rack PDU Advanced Gen 2, Metered, 3Phase, 43.5kW 400V 63A or 34.6kW 415V 60A, 560P6, 42 Outlet — APC
APC

APC NetShelter Rack PDU Advanced Gen 2, Metered, 3Phase, 43.5kW 400V 63A or 34.6kW 415V 60A, 560P6, 42 Outlet

Part number UPAPC-APDU11450ME

$5,462.95 RRP $6,215.00 Save $752.05

Includes GST · $496.63 GST

Low stock (4)

Ships from an interstate branch — $35, 1–3 business days. Express is not available on this item right now because the stock is not in a local warehouse.

Need it installed? Ask for a supply-and-install quote — usually cheaper than sourcing an installer separately.

Description

APC NetShelter Rack PDU Advanced Gen 2, Metered, 3Phase, 43.5kW 400V 63A or 34.6kW 415V 60A, 560P6, 42 Outlet


APC NetShelter Rack PDU Advanced (11K Series) provides reliable power distribution to IT equipment within server and/or networking racks. PDU level power metering provides power visibility and notification of potential overload. 4-in-1 combination outlets which can be used as either C13, C19, C15, or C21 outlets provide unparalleled deployment flexibility. Maximum outlet density with 42 outlets in a 2.2 in. (5.6 cm) wide form factor allows for more equipment in the rack. Outlets on the PDUs are color coded and labeled by breaker. Live Swap the NMC3 to minimize downtime in the unlikely event of an NMC power event. The rack PDU integrates with EcoStruxure IT through an NMC3 and can be accessed and configured via web, SNMP, and command line interface (CLI). A 10-foot (3-meter) input cord makes it easier for the PDU to reach the power supply. Rated to operate up to 60 C (140 F) at full load ensures reliability and availability even in today's high-density deployments. One gigabit Ethernet/network port (10/100/1000) enhances and standardizes network connectivity. Two link ports are available to cascade to up to 32 PDUs, with a network port sharing (NPS) feature to enable power sharing between Rack PDUs in the cascading group. Track or bill power usage confidently with 1% metering accuracy. Two environmental sensor ports allow for optional sensors (sold separately) to be connected. For data center deployments across multiple regions, these PDUs have the following certifications: UL, CE, CSA, UKCA, Nemiko, PSE, KC, China RoHS, RCM, and CMIM. This model’s input power cord is IEC-309 60 A 3P+N+PE and features 21 count C13/C15/C19/C21 combo outlets and 21 count C13/C15 outlets.
  • Australia-wide deliveryMelbourne metro typically 1–3 business days.
  • Full manufacturer warrantyWe administer claims for you.
  • Installed by the people who sell itAsk for a combined supply-and-install price.

More like this

Others in Data Racks & Accessories

Want this installed properly?

We install this equipment on Melbourne sites every week. Ask for a supply-and-install quote and you get one supplier, one warranty conversation and a system commissioned by the people who sold it to you.

Get in touch

Ask about APC NetShelter Rack PDU Advanced Gen 2, Metered, 3Phase, 43.5kW 400V 63A or 34.6kW 415V 60A, 560P6, 42 Outlet

Quantities, lead time, compatibility or a supply-and-install price on the UPAPC-APDU11450ME — send it through and we will come back the same business day.

  • Trade-informed pricingDistributor cost plus a transparent margin, not a retail markup.
  • Anything in the rangeThe catalogue online is a fraction of what we can order — ask for a part number.
  • Supply and installWant it fitted? Ask for a combined quote; the labour is usually where the saving is.
  • Australia-wide deliveryMelbourne metro 1–3 business days, with express where the stock is local.

We reply within one business day. Your details are used only to answer this enquiry — see our privacy policy. Protected by reCAPTCHA.

Reviews

Rated by Melbourne businesses

Shop now Service call Call